ILC Global Design Effort Project Manager visit to SCRF cavity manufacturers February - March 2009

In early 2009 the ILC Global Design Effort Project Managers (Akira Yamamoto, Marc Ross, and Nick Walker) visited and were graciously hosted by many of the world’s top superconducting RF cavity manufacturers. The objective of the visit was to:

  1. Learn industrial status and possible future at cavity manufacturers.
  2. Communicate the ILC GDE Technical Design Phase R&D Plan.
  3. Request further industrial R&D effort, particularly to improve “field gradient” and “cost effective production” in order to prepare for the industrialization (mass production).
  4. Establish close communication and a confident relationship between ILC GDE and vendors.

This web page is intended to capture the material presented to vendors and to include key references.

Global R&D Effort of SCRF Cavity Development for the International Linear Collider (pdf, 5Mb, English)
国際線形衝突型加速器における超伝導高周波加速空洞の国際開発協力r (pdf, 20Mb, Japanese)
Akira Yamamoto, Marc Ross, and Nick Walker - Project Managers for the ILC Global Design Effort, material presented to each of the SCRF cavity manufacturers.
Superconducting RF Cavity Development for the International Linear Collider (pdf, 4Mb)
Akira Yamamoto for the ILC Global Design Effort, paper presented at Applied Superconductivity Conference 2008 (ASC 2008).
Global R&D effort for the ILC linac technology (pdf, 4Mb)
Akira Yamamoto for the ILC Global Design Effort, paper presented to EPAC 2008.

 

Reference Design Report
 

Download the full report

Volume 3 - Accelerator: Download the pdf (20MB)

ILC Research and Development Plan for the Technical Design Phase

 

Download the pdf


(Last updated: 25 February 2009)

You are here